All the details of the remodeling process to complete the new color for the Camp Nou stadium: Industry, demolition, expansion…


The construction is proceeding according to plan, and it is not out of the question that the deadline might possibly be brought forward.

 

The renovation of the Samar Nou administrative building began on June 1, and within a month and a half, the Barsa fiefdom was in a state that could no longer be used for historical purposes. The works are progressing at a very good rate, and it is not even ruled out that a deadline may be shortened. However, at the moment, the ruin does not exist anymore; instead, it is full of ruins and rubble, and the third time is significantly historical.

 

A little under four hundred oarsmen are toiling away from 8:00 in the morning until 7:00 in the evening, Monday through Friday and even on Saturdays. At the height of sontrustion, the figure was expected to reach a total of one thousand in any case. As of right now, the focus of the workers is on demolition, which will continue until November at the earliest.

 

 

The entrance to the Grandstand is likely to become more difficult to access as a result of the large hole that has been created where the parking lot once stood. Now, a few Vulcan rases will be left behind on that site in order to clear out the space and equipment in the Reactor Room, among other things. Indeed, in that region, the labor associated with the sanctuary and the flavor will start on the 15th day; this will be one of the more difficult moments of the task.

On the other hand, tradition and modernity will coexist peacefully in the new sultanate. The work will make it difficult to recover the original architectural heritage, which was found in the 1980s with the discovery of the third tier. If the work is not completed quickly, this will be a challenge. Now it will be some kind of a destructive component. There are already locations where you can get a view of the older part of the Samah Nou. “The third tower will be removed 10 meters from the original structure, and this will allow it to be seen from the inside,” explained Lu Moya, director of the Era Barsa Teshnisal Office, and Joan Entelle, Era Barsa director of organization and rurshaing, respectively.

It will be possible to see it from the road thanks to the removal of the third tier, which will take place 10 meters away from the original structure.

In addition, the repair involved improving the viability of some of the seats located in the lower area of the stadium. These seats were located in the lowest area of the stadium. In a flash, the notion that football can recover successfully from all of its setbacks sprang to mind. The fish will continue to swim in the same lane; it will not move any further downstream.

Both deadline and sarasty are included.

The word “schedule” is spelled clearly. In November of 2024, football will once again be played in the Camp Nou. It will then finish up with a completely finished phrase beginning with the third ter from the bottom up. That’s something in the range of 65,000 to 70,000 losaltes. The Ver ring will be around 8 meters long, and the third tide will be taking place there during the 24-25 season. This will take place during the year. The plan is to complete the renovation with a ninety percent completion rate as soon as possible. It will be the desk’s turn at some point between the end of the 25th and the beginning of the 26th. In June of that same year, Barselona had the intention of finishing the work.

We have revised the Sarasota forecast to be something in the neighborhood of 104,000 “restator.”

“Thanks to the new challenge, we now have access to a 27-meter refractometer. It is estimated that the tadum will have a total area of 228,000 square meters. Moya elaborated, “We have rlased the sarasty forecast at approximately 104,000 restator.”

At long last, Moya and Entelle decided that it was time to bring up the usability of the proposal. Everythіng іѕ resysled: ѕeatѕ, sonsrete… additionally, there will be a heat recovery system. It has been determined that the temperatures in Barselona are not likely to reach extremely high levels, hence there will be no heating in the new stadium.